Foundation Stage
HISTORY OF CSI
- 2002.12.
- Establishment of Ulsan Plant
- 1996.08.
- Began to export DHT Hammer & Bit to the US
- Southeast Asia, Europe and the Middle East
- 1994.08.
- Designated as an eligible SME by the Bank of Korea
- 1993.02.
- Incorporated as CHANG SHIN International Co., Ltd.
Growth Stage
- 2010.11.
- Certified INNOBIZ (SME with innovative technology)
- 2007.12.
- Patented - Auger Hammer
- 2007.10.
- Received Presidential Award - '1 Million US Dollar Export Tower
- 2006.12.
- Selected as a business with managerial innovation by SMBA
- 2005.10.
- CE mark - Drilling Rig
- 2005.07.
- Selected as a promising exporter by SMBA
- 2005.03.
- Selected as a promising exporter by SMBA
- 2005.02.
- Participated in the technological innovation development program of SMBA
- 2004.11.
- ISO 9001:2002 certified
- Acquired CE mark - CS-Power-Hammer
- 2004.09.
- Developed Adavanced Roof Pilling M/C
- 2004.02.
- Patented
- - Apparatus/method of inserting steel piles simultaneously while drilling
Leaping Stage
- 2019.
- Acquire CE Mark for KR-5000 M/C
- 2018.
- Develop Water C M/C KR-5000
- Develop Water Cluster Hammer(World First)
- Acquire CE Mark for Water Pump
- 2017.
- Acquire CE Mark for Water DTH Hammer
- Acquire KOSHA 18001 Certification
- 2016.
- Appointed as Promising Company
- 2015.
- Certify ISO 14001 Environmental management system
- 2014.12.
- Relocated to expand into a new factory
- 2014.07.
- Selected as a global star venture company in 2014
- 2014.04.
- Selected as an IP star company in Ulsan
- 2013.11.
- Received Presidential Award - '3 Million US Dollar Export Tower'
- 2013.07.
- Selected as a global star venture company in 2013
- 2013.04.
- Selected as a Global Brand by KOTRA
- 2012.05.
- Certified as a venture company
- 2012.05.
- Selected as a small but strong global company
- 2013.04.
- Certified ISO 14001 Environmental Management System
- 2011.10.
- Estabilished the affiliated technology research center
- 2011.06.
- Designeated as a promising small and medium-sized exporter